During
the estimates for replacing the roof of the church, it was brought to
our attention that the infrastructure of the bell tower was in a state
of deterioration. We thus had structural engineers visit the site and
provide us with a report. Their advice was that the bell had to be
brought down and the support structure repaired before anything could
be done to repair the roof. |
||
|
Bringing down of the statue of the Sacred Heart of Jesus |
Opening of the south wall of the bell chamber |
Removal of the bell |
![]() Once on the ground, the bell
was sandblasted and repainted ready for its trip back to the steeple. |
![]() Return of the painted bell and wheel, ready for re-installation in the steeple. |
![]() Hoisting of the bell back into the steeple chamber. |
![]() Repositioning of bell inside the chamber. |
![]() Bell back in its resting place, ready for wall to be closed |
![]() Sacred Heart of Jesus statue, being repainted after repairs. |
![]() Repaired and repainted, S-H of Jesus statue is ready for return to it niche. |
![]() Hoisted back into its refreshed niche, the Sacred-Heart of Jesus statue, once again ovelooks Richer. |
![]() The bell tower chamber wall repaired and ready for paint. |
![]() First sunset for the restored structure. |
||