| Church restoration |
Much of the York stone floor is now in place (protected by hard-board). The rest of the floor area is being prepared for the wood flooring in the bench areas. The window frames for the tower and "cloister" are being readied prior to installation. The scaffolding comes off the tower.
|
|
|
|
|
|
|
|
|
|
|
|
![]() |
![]() |